How Long Does a Home Remodel Take?
If you’re like many homeowners, you’ve probably toyed with the idea of a renovation. However, you may be concerned about how long it might take. Ultimately, it depends on the extent of what needs to be done. While some limited projects may only require a few days, major ones could take up to a year or more.
A trusted renovation contractor in Lancaster, PA, can give you an estimate for your home renovation timeline based on the plans you have in mind. Learn more about the most common types of home renovations that you may encounter.
Cosmetic Remodeling Work With Minimal Teardown
Some remodeling work involves tasks as simple as replacing flooring or repainting a few rooms. When remodeling preparations involve minimal demolition, this qualifies as primarily cosmetic work. Replacing a sink or shower head could also qualify as cosmetic.
How long does a home remodel take when you’re only doing cosmetic work? Small jobs can take a day or two, while others might take about a week.
Often, homeowners will try to handle cosmetic jobs themselves. Such work rarely requires pulling permits or using licensed contractors, which means DIYers can have success with these projects.
Average Renovation Jobs That Involve Some Demolition Work
When starting a house remodel, most people can expect an average renovation job. Examples include:
Adding a fireplace
Repairing electrical wiring
Relocating a sink
Adding a wall
Replacing a ceiling
Remodeling a kitchen
Average remodeling work can take anywhere from one to several weeks. You might consider a design-build team to help with this project, as you’ll need licensed contractors, plumbers, or electricians to get the job done. The work may involve pulling permits from local authorities, which the design-build team can help with.
Meet with the designers to discuss the project and determine whether your budget will accommodate what you envision.
Significant Remodeling Projects That Add Living Space or Involve Major Repair and Demolition
How long does a home remodel take when you’re performing a major renovation? Renovations that involve redoing a basement, adding a second floor to a house, or repairing the foundation can take a few months to a year or longer.
Rewiring the house or redoing the plumbing often takes a few months. Contractors may need to tear out walls or ceilings to reach the plumbing and wiring, which lengthens the timeline for renovation. You might also need to employ drywallers, painters, and flooring experts, even though your main focus is the wiring or plumbing.
Such projects require several building permits and typically involve hiring multiple subcontractors. A design-build company will put together a team that streamlines the process and reduces the timeline required to finish the work.
Trust Vatter Construction for a Streamlined Remodeling Experience
When you want the best local design-build experts in the Lancaster, PA, region, count on Vatter Construction.
How long does a home remodel take, and does a design-build team make the process go faster? By working together as a team, our designers and contractors can streamline the project and usually complete it faster than if you were to hire separate designers, contractors, and subcontractors.
When you want to make valuable additions to your house, we can meet your needs while often beating the average home remodel duration timeline. To set up an appointment to discuss your project, call us today at (717) 883-5809.
Frequently Asked Questions
When you have questions about the factors affecting the remodel timeline, our design-build experts are happy to answer them.
-
Yes, it can take a long time to add a second story to a house. These types of projects usually require at least four to eight months of work, but some projects can even take longer, depending on the complexity.
-
The duration of a bathroom remodel ultimately depends on the extent of changes required. Simple bathroom remodeling jobs that involve mostly surface-level changes may take about a week, while more extensive projects might require several.
-
The kitchen remodel schedule depends on whether you need to redo plumbing and wiring, which can take three to six months. Kitchen renovations that are mostly cosmetic might take just a week or two.
-
Yes, a design-build construction team can speed up the remodeling work timeline because the team operates as a single entity. This means the property owner has a single point of contact throughout, which helps keep everything on track, reducing delays.